GEA Text logo GEA text logo
GEA Member Information
GEA Expo 2014
NCPA II   Power Plant Details
Owner Location Start Year Plant Type # of Units Installed capacity (MW) Running capacity (MW)
Northern California Power Agency The Geysers, CA 1985 Dry Steam 2 110 52
Additional information:
Unique Information about the NCPA Geothermal Project: NCPA received two grant awards from the California Energy Commission as follows: - $316,642 to develop an integrated geothermal systems simulator that optimizes a geothermal project from the system level including the geothermal reservoir, the - $669,334 to develop a down-hold generator that would operate in a geothermal injection well and be powered by the falling water within the well. Generator capacity in the 0.5 to 1 MW range. NCPA is planning to drill a second near horizontal injection well. The first horizontal injection well has been found to enhance the recovery of injection derived steam, while also controlling the frequency and magnitude of geothermal operations related seismic events.
Web Site: http://www.ncpa.com/generation-plants/2.html
 
ncpa 2 image
Skip Navigation LinksGEA > Geothermal power plants > Power plant details